Reusable Niagara 4 graphics: relative ORDs, PX includes and one page for many units

Build a PX graphic once and reuse it for every identical unit: absolute vs relative ORDs, relativising a page, PX include banners and a sensible home page.

By Berk · 16 November 2026 · 3 min read

A building with forty fan coil units doesn’t need forty graphics. It needs one graphic, built properly and reused forty times. Niagara 4 has the tools for this, but they only work if the station is structured consistently. Here’s how it fits together.

ORDs: how a graphic finds its points

Every binding on a PX page points at its data using an ORD, Niagara’s address for an object. There are two styles.

An absolute ORD spells out the full path from the station root, something like station:|slot:/Drivers/BacnetNetwork/FCU_01/points/SpaceTemp. It always finds exactly that point, which is fine for a one-off page and useless for reuse.

A relative ORD gives the path from the component the view is attached to, something like slot:points/SpaceTemp. Attach the same page to FCU_02 and it finds FCU_02’s SpaceTemp.

Relativising a page

Build and test the graphic on one unit using normal drag-and-drop bindings, which produces absolute ORDs. Then, in the PX editor, use the relativise option on the bound ORDs. Niagara rewrites the bindings relative to the component the view belongs to.

Then, on each other identical unit, add a new view and choose to reuse the existing PX file rather than create a new one. One file, many views.

The catch: consistency

Reuse only works if every unit has the same internal structure and point names. If FCU_07 calls its sensor SpaceTemperature instead of SpaceTemp, that binding breaks on FCU_07’s page.

That’s another argument for:

  • naming points to a standard as you add them
  • building one unit properly, then duplicating it (or deploying it from a template) rather than building each by hand
  • checking each reused page at commissioning, because a broken binding shows up immediately

When the devices themselves are identical, duplicating the first fully built device, with its points, extensions and graphic, and then changing only its address is often the fastest route.

PX includes: build the banner once

Most sites want the same banner on every page: site name, logo, outside air temperature, date and time, and the main navigation buttons. Copying that onto every graphic means editing every graphic whenever it changes.

A PX include solves this. You build the banner as its own PX file, then embed it in each page with a PxInclude widget. Change the banner file, and every page that includes it updates.

Bindings inside an include should use absolute ORDs for site-wide values like the outside air temperature, because the include is reused on pages attached to many different components.

The same idea works for other repeated pieces, such as a standard alarm summary box or a footer.

A home page that works

The home page is usually the first thing people see. A good one:

  • gives an overview of the site: buildings, floors or main systems, with a clear way into each
  • shows a handful of headline values, such as outside temperature, active alarms, and key plant running
  • uses the same banner and style as every other page

Attach it as a view on a sensible component, such as the station root or a dedicated home folder, and set it as users’ landing page through their nav file. See users, roles and nav files.

Reuse plus templates

Reusable graphics go furthest when combined with device templates. A template can carry its graphics with it, so every deployed device arrives with a working page already attached. On a site with dozens of identical meters or FCUs, that turns days of graphics work into minutes. See palettes, templates and bulk deployment.

Quick checklist

  • Build and test one unit’s page with real data.
  • Relativise its ORDs.
  • Check every target unit has identical point names.
  • Reuse the PX file as a view on each unit.
  • Put shared elements in PX includes, using absolute ORDs for site-wide values.
  • Open every reused page once at commissioning to prove the bindings.

New to PX? Start with building PX graphics in Niagara 4.

Keep reading