Niagara 4 explained: Workbench, platforms, stations and JACEs

How the parts of a Niagara 4 system fit together: Workbench, the platform daemon, stations, JACEs and supervisors, plus the ports involved and how a new station is built.

By Berk · 16 November 2026 · 4 min read

Niagara 4 confuses a lot of people at first because the same few words get used loosely on site. “Log into the JACE” might mean the platform, the station, or the web page. Once you know which part is which, faults and setup steps make a lot more sense.

The pieces

Workbench is the engineering tool. It runs on your laptop or a server and it’s how you build, edit and commission everything. It’s also a station host in its own right, which is how you can run a test station on your own PC.

A station is the actual application: the database of components, drivers, logic, schedules, alarms, histories, graphics and users. When people say “the BMS” on a Niagara site, they normally mean the station. It lives as a set of files (the main one is config.bog) and runs inside a Java process on its host.

The platform is the layer underneath the station on each host. A small service called the platform daemon looks after the host itself: installed software modules, licences, certificates, network settings, date and time, backups, and starting and stopping the station. You connect to the platform separately from the station, with its own credentials.

A JACE is Tridium’s embedded controller: a small box in a panel that hosts one station and connects to field networks such as BACnet MS/TP, Modbus and LON. You’ll find JACE 8000s on most current sites and the newer JACE 9000 on recent jobs. Several manufacturers sell Niagara under their own brand (Honeywell WEBs, Distech EC-Net and Johnson Controls Facility Explorer, among others), but the engineering underneath is the same.

A supervisor is a station that runs on a PC or server rather than a JACE. It pulls together data from many JACEs, keeps long-term histories, handles alarms centrally and serves the main web front end.

Platform connection vs station connection

This is the distinction that trips people up most:

Connecting to What you can do Default secure port
Platform Install software, licences and certificates; set IP and time; start, stop and copy stations 5011 (HTTPS)
Station from Workbench Engineer the application 4911 (Foxs)
Station from a browser Operate the system, view graphics, alarms and trends 443 (HTTPS)

The older unencrypted ports (3011 for the platform and 1911 for Fox) are still around on old sites, but they shouldn’t be used on new work. Niagara 4.15 also added Fox over WebSocket, which lets station connections run through port 443 when IT won’t open 4911.

If you can get to the platform but not the station, the station probably isn’t running, or its ports are blocked. If you can’t get to either, look at the network first.

Where station files live

When you create a station in Workbench, it’s saved in your user home folder. The platform daemon can only run stations from its own protected daemon home, so a new station has to be copied across before it’ll run, even on your own PC. The Station Copier tool, under the platform tools, does this both for your local host and for a JACE.

It’s worth getting this straight early. Plenty of engineers have edited the copy in user home and then wondered why the running station hasn’t changed.

Building a new station

New stations come from the New Station Wizard on the Workbench Tools menu. You give the station a name, pick a station template, and set the admin password.

Station templates are worth more than they look. A template is a ready-made starting point that can include your standard services, users and roles, tag dictionaries, alarm classes, palettes and folder structure. If every job starts from your company’s own template, every site looks the same, and that saves a lot of time when someone else has to service it. There’s more on templates in palettes, templates and bulk deployment.

Offline or online engineering?

There are two ways to approach a job.

Online means the station runs on the JACE (or on your PC) while you build it. You see live values straight away and can test as you go. When the JACE and the field devices are available, this is the normal way to work.

Offline means you build the station in the office before the hardware is on site, then commission it onto the JACE later. It works well for drawing up graphics, logic and structure, but you can’t test anything against real devices until you get there.

Most real projects mix the two: structure and graphics are prepared offline, and the station goes onto the JACE as soon as one is available.

A few habits that save trouble

  • Keep Workbench and the JACE on compatible versions. Workbench should be the same Niagara version as the JACE, or newer.
  • Take a backup before every change of any size. The platform can make a full backup of a station in one go.
  • Give stations sensible, unique names. Station names appear in history IDs and in the Niagara network, so renaming one later is a pain.
  • Write down the platform and station credentials somewhere secure that the client owns, not only in your head.

Next in the series: components, slots and the wire sheet, and then commissioning a JACE.

Sources

Keep reading